Tasmanian Government LogoJustice Portal pages

Further information supplied by Gunns


Table 1 - Further information referred to in Schedules LU1, LU2, LU3, LU4 and EM1 of the Pulp Mill Permit. Microsoft Word icon

A-plan Adobe PDF icon [1.6 mb]
Information from Gunns regarding layout changes at the mill site for an improved environmental outcome

A-text Adobe PDF icon [92.4 kb]
Information from Gunns regarding layout changes at the mill site for an improved environmental outcome

B-map Adobe PDF icon [122.4 kb]
Map from Gunns showing the areas for revocation and construction corridors in Trevallyn Reserve

C-text Adobe PDF icon [847.9 kb]
Details of concurrency and use of data for calibration/verification of the hydrodynamic model

D-map Adobe PDF icon [157.6 kb]
Map from Gunns showing the areas for revocation and construction corridors in Trevallyn Reserve

RFI001 Adobe PDF icon [413.5 kb]
Analyses of data from marine benthic monitoring around the proposed outfall of the Gunns Pulp Mill - Report prepared by Aquenal Pty Ltd Feb 2007

RFI005 Adobe PDF icon [33.7 kb]
Updated details following design alterations to mill specifications based on the selection of equipment suppliers

RFI012 Adobe PDF icon [36.6 kb]
Response to request for clarification of the location and width of the water supply pipeline, the location of the balancing tank, the degree of revegetation proposed and the configuration of the above ground sections of the pipeline within the Trevallyn Reserve

RFI018 Adobe PDF icon [70.1 kb]
Response to request for confirmation of option for wharf design

RFI025 Adobe PDF icon [91.1 kb]
Elementary analysis of native and plantation eucalypt and pine

RFI025-HSL Adobe PDF icon [20.3 kb]
Elementary analysis of native and plantation eucalypt and pine

RFI026(a) Adobe PDF icon [108.3 kb]
Response to request for details of mill site preparation equipment, construction operating hours and construction noise

RFI026(a) Adobe PDF icon [108.3 kb]
Response to request for details of mill site preparation equipment, construction operating hours and construction noise

RFI026(b) Adobe PDF icon [29.1 kb]
Revised site preparation/excavation plan

RFI027(b) Adobe PDF icon [2.0 mb]
Details of proposed transmission line location

RFI027(a) Adobe PDF icon [3.5 mb]
Revised proposed site layout plan

RFI027(c) Adobe PDF icon [1.8 mb]
Details of proposed vegetation clearance area

RFI028 Adobe PDF icon [208.9 kb]
Response to request for information regarding chlorate production in the chemical plant and amount and composition of gaseous, liquid and solid emissions from the chemical plant

RFI029(a) Adobe PDF icon [381.7 kb]
Response to request for information regarding conditions at the edge of the mixing zone in Bass Strait

RFI029(b) Adobe PDF icon [44.8 kb]
Response to request for information regarding conditions at the edge of the mixing zone in Bass Strait

RFI029(c) Adobe PDF icon [603.5 kb]
Response to request for information regarding conditions at the edge of the mixing zone in Bass Strait

RFI030-GHD Adobe PDF icon [499.7 kb]
Additional information about the hydrodynamic model for Bass Strait

RFI030-Paterson Adobe PDF icon [580.9 kb]
Additional information about the hydrodynamic model for Bass Strait

RFI031 Adobe PDF icon [626.3 kb]
Gunns response to concerns raised by Professor Andrew Wadsley

RFI033(a) Adobe PDF icon [281.5 kb]
Detailed plan for the location of and design of the landfill, reservoir, quarry and infrastructure connections

RFI033(b) Adobe PDF icon [342.9 kb]
Detailed plan for the bale warehouse

RFI033(c) Adobe PDF icon [77.0 kb]
Detailed plan for the wharf, office and wharf amenities

RFI033(d) Adobe PDF icon [41.4 kb]
Response to request for details of amount of wood chips produced on site and amount imported from other chip mills

RFI035 Adobe PDF icon [311.4 kb]
Response to request for information about chemical plant emission points and predicted emissions for base-case and merchant-base production levels

RFI036 Adobe PDF icon [43.4 kb]
Response to request for information about the chemical plant

RFI037(a) Adobe PDF icon [139.4 kb]
Details of the effect of the reduced scale of earthworks on 24 hour construction

RFI037(b) Adobe PDF icon [50.9 kb]
Details of various chemical processes and emissions from the chemical plant

You will need a PDF viewer such as Adobe Reader to view PDF documents. Download Adobe Reader
Please contact us if you have difficulty viewing or printing the document