A-plan [1.6 mb]
Information from Gunns regarding layout changes at the mill site for an improved environmental outcome
A-text [92.4 kb]
Information from Gunns regarding layout changes at the mill site for an improved environmental outcome
B-map [122.4 kb]
Map from Gunns showing the areas for revocation and construction corridors in Trevallyn Reserve
C-text [847.9 kb]
Details of concurrency and use of data for calibration/verification of the hydrodynamic model
D-map [157.6 kb]
Map from Gunns showing the areas for revocation and construction corridors in Trevallyn Reserve
RFI001 [413.5 kb]
Analyses of data from marine benthic monitoring around the proposed outfall of the Gunns Pulp Mill - Report prepared by Aquenal Pty Ltd Feb 2007
RFI005 [33.7 kb]
Updated details following design alterations to mill specifications based on the selection of equipment suppliers
RFI012 [36.6 kb]
Response to request for clarification of the location and width of the water supply pipeline, the location of the balancing tank, the degree of revegetation proposed and the configuration of the above ground sections of the pipeline within the Trevallyn Reserve
RFI018 [70.1 kb]
Response to request for confirmation of option for wharf design
RFI025 [91.1 kb]
Elementary analysis of native and plantation eucalypt and pine
RFI025-HSL [20.3 kb]
Elementary analysis of native and plantation eucalypt and pine
RFI026(a) [108.3 kb]
Response to request for details of mill site preparation equipment, construction operating hours and construction noise
RFI026(a) [108.3 kb]
Response to request for details of mill site preparation equipment, construction operating hours and construction noise
RFI026(b) [29.1 kb]
Revised site preparation/excavation plan
RFI027(b) [2.0 mb]
Details of proposed transmission line location
RFI027(a) [3.5 mb]
Revised proposed site layout plan
RFI027(c) [1.8 mb]
Details of proposed vegetation clearance area
RFI028 [208.9 kb]
Response to request for information regarding chlorate production in the chemical plant and amount and composition of gaseous, liquid and solid emissions from the chemical plant
RFI029(a) [381.7 kb]
Response to request for information regarding conditions at the edge of the mixing zone in Bass Strait
RFI029(b) [44.8 kb]
Response to request for information regarding conditions at the edge of the mixing zone in Bass Strait
RFI029(c) [603.5 kb]
Response to request for information regarding conditions at the edge of the mixing zone in Bass Strait
RFI030-GHD [499.7 kb]
Additional information about the hydrodynamic model for Bass Strait
RFI030-Paterson [580.9 kb]
Additional information about the hydrodynamic model for Bass Strait
RFI031 [626.3 kb]
Gunns response to concerns raised by Professor Andrew Wadsley
RFI033(a) [281.5 kb]
Detailed plan for the location of and design of the landfill, reservoir, quarry and infrastructure connections
RFI033(b) [342.9 kb]
Detailed plan for the bale warehouse
RFI033(c) [77.0 kb]
Detailed plan for the wharf, office and wharf amenities
RFI033(d) [41.4 kb]
Response to request for details of amount of wood chips produced on site and amount imported from other chip mills
RFI035 [311.4 kb]
Response to request for information about chemical plant emission points and predicted emissions for base-case and merchant-base production levels
RFI036 [43.4 kb]
Response to request for information about the chemical plant
RFI037(a) [139.4 kb]
Details of the effect of the reduced scale of earthworks on 24 hour construction
RFI037(b) [50.9 kb]
Details of various chemical processes and emissions from the chemical plant
You will need a PDF viewer such as Adobe Reader to view PDF documents. ![]()
Please contact us if you have difficulty viewing or printing the document